Sign In | Join Free | My fazendomedia.com
China Guangdong Bunge Building Material Industrial Co., Ltd logo
Guangdong Bunge Building Material Industrial Co., Ltd
Movable Walls, Creative Space Solutions Operable Partitions, Creat Flexible Space +0086 15899953127 WhatsApp/Wechat gzbunge@hotmail.com, gzbunge@gmail.com
Verified Supplier

7 Years

Home > Folding Partition Walls >

Fabric Surface Demountable Mobile Foldable Partition Wall For Church

Guangdong Bunge Building Material Industrial Co., Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment

Fabric Surface Demountable Mobile Foldable Partition Wall For Church

Brand Name : EBUNGE

Model Number : Type 65 foldable partition wall

Certification : ISO 9001

Place of Origin : Guangzhou, China

MOQ : NO MOQ, small quantity welcome

Price : $82-88 per square meter

Payment Terms : T/T, MoneyGram

Supply Ability : 50000 square meters per month

Delivery Time : 7-15 days

Packaging Details : Paper carton, outside with wooden box

Product name : Foldable partition wall

Application : Church partition wall

Finishing : Fabric

Frame : Aluminum

Feature : Acoustic partition

Weight : 25 kg/m²

Contact Now

Fabric Surface Demountable Mobile Foldable Partition Wall for Church


How to maintain the foldable partition walls?


1. Clean & lightly lubricate all track running surfaces.


2. Check trolleys for any signs of abnormal wear or breakage. Replace as needed.


3. Check foldable partition wall panels "out of plumb" (indicating loose trolley bolts). Correct by adjusting to plumb and tightening trolley nuts.


4. Check any exposed bolts on foldable partition wall panel's vertical edges and tighten if required.


5. Check for foldable partition wall track misalignment at all joints & intersections and adjust if needed.


6. Check lever closure and adjust as needed.


7. Check and make sure all top & bottom seals are functioning properly.


8. Operate pass door and adjust as needed.


9. Check for torn vinyl / fabric and repair or replace as needed.


10. Contact with us if the problem can’t be solved by the owner.


Technical Information


SeriesBG65BG85BG100
Panel suspensionTop hung onlyTop hung onlyTop hung only
Track systemSingle or twin pointSingle or twin pointSingle or twin point
Panel thickness65mm80mm / 85mm100mm
Panel heightUp to 4000mmUp to 6000mmUp to 18000mm
Max height4000mm6000mm18000mm
Panel width600-1230mm600-1230mm600-1230mm
Frame constructionAluminum frameAluminum frameAluminum frame
Face material9mm9mm / 12mm12mm
Fire safetyOptional Class I or OOptional Class I or OOptional Class I or O
Vertical profilesAluminum anodised with sealing profilesAluminum anodised with sealing profilesAluminum anodised with sealing profiles
Retractable sealsAluminum black with
double rubber seals
Aluminum black with double rubber sealsAluminum black with double rubber seals
Operation of sealsManual, with supplied
operating handle
Manual, with supplied operating handleManual, with supplied operating handle
LockingOptional lock to pass doorsOptional lock to pass doorsOptional lock to pass doors
Pass doorsSingle open in panel or
double open in two panel
Single open in panel or double open in two panelSingle open in panel or double open in two panel
Sound insulation20-32dB Rw28-36dB Rw32-50dB Rw
WeightApprox 22-35kg/sq MApprox 25-40kg/sq MApprox30-48kg/sq M
Finish MaterialPlywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc. (Customized)

Foldable partition wall solution


PROBLEMPOSSIBLE CAUSEPROBABLE SOLUTION
Panels Hanging out of plumb.1. Loose or broken trolleys. 2. Broken Trolley Support Beam.1. Tighten loose carries to return panel to plumb. 2. Replace any broken carriers or support beam.
Panels sticking or hard to move.1. Dirt in the track. 2.less lubricate oil.3. Misaligned track joints. 3. Trolley Broken.1. Clean track. 2.Spread lubricate oil on the track.2. Align joints. 3. Replace trolley.
Abnormal noise during movement.1. Broken trolley 2. Misaligned track joints1. Replace trolley 2. Align joints
Top and bottom seal inoperative1.Cranking mechanism stripped / broken link to mechanism 2.top seal stuck by the trolley support beam

1. Straighten or replace seal. /. Replace

2.Adjust the size of the hole located on the top seal

Pass doors not latching1. Strike plate out of adjustment. 2.door jamb over pressure compressed.1. Readjust strike plate. 2. Reverse previous step to re position the pass door,and not compress the LCP to much pressure
Broken or worn trolleys

1. Bad track joints.

2. 2. Abusive handling at "T" or "L" intersections.

1. Realign track joints & replace trolleys.

2. Replace trolleys and retrain personnel.

Lever closure jamb not extending or operates difficult.1. Internal mechanism stripped. 2. Limit cables or chains tangled. 3. Tension bolts too tight.1. Replace mechanism. 2. Adjust limit chains. 3. Adjust tension bolts on mechanism.


Product Tags:

Demountable Foldable Partition Wall

      

Melamine Foldable Partition Wall

      
Best Fabric Surface Demountable Mobile Foldable Partition Wall For Church wholesale

Fabric Surface Demountable Mobile Foldable Partition Wall For Church Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Guangdong Bunge Building Material Industrial Co., Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)